
* Least-cost cases are shown; however, core cases show very similar achieved GHG, RPS, and CES ** Least-cost cases show 2025 binding after Diablo Canyon retirement; core cases have …
The CAISO will model the adopted base case portfolio as the reliability and policy-driven base case in the CAISO’s 2024-2025 Transmission Planning Process (TPP).
CalCCA supports the Commission’s recommendation of the 25 million metric ton (MMT) Core Portfolio and recommends the Commission plan for an 8 MMT target or lower for 2045 in …
We can confirm that the 38 MMT Core includes resources sufficient to meet both IRP procurement orders. This is true in the CPUC and CEC analyses of the proposed PSP.
Monthly import/export results for both Core cases and Least Cost cases show an increase in exports during months of April to June compared to other months of the year.
These factors were calculated using the "least-cost" RESOLVE portfolios, since cases w/ LSE plans were found to be over-reliable in RESOLVE in the near- to mid-term.
Mid-Term Reliability Decision (D.21-06-035) RESOLVE Implementation. •PRM: aligned with MTR Need Determination Model1“High Need” scenario from 2024.
• Purpose: Understand the CAISO system resources needed to meet the GHG target (25 MMT or 30 MMT by 2035), clean energy targets, and reliability needs at least-cost, unconstrained by …
Oct 5, 2023 · In general, the Least-Cost cases show a visibly lower-cost portfolio than the Core cases, estimated at roughly $1.5 billion annually over the planning period, or approximately 2 …
LCOE is not a RESOLVE input or output but can be inferred from dispatch results. The LCOE of individual resources would vary by factors such as resource location and availability. All-in …